Projects
Reference Projects
OMD Consultancy has gained extensive hands on experience in engineering and construction project management through its founding partner’s 10 years of professional participation in the construction industry. The following are some of the landmark projects that OMD Consultancy’s founding partner has been involved in throughout his career.
Northern Marmara Motorway
Incl. 3rd Bosporus Bridge
- Contractor: IC Ictas - Astaldi JV
- Investment Model: Build-Operate-Transfer
- Investment Cost: 3,500,000,000 USD
- Location: Istanbul / Turkey
- Scope: A total of 150 km 2x4 lane motorway including connection roads and the suspension/cable stay hybrid 3rd Bosporus Bridge with a main span of 1408 m.
Istanbul - Izmir Motorway
- Contractor: Nurol-Ozaltin-Makyol-Astaldi-Yuksel-Gocay JV
- Investment Model: Build-Operate-Transfer
- Investment Cost: 7,700,000,000 USD
- Location: Istanbul-Izmir / Turkey
- Scope: A total of 427 km 2x3 lane motorway including connection roads and the suspension bridge with a main span of 1550 m.
Ilisu Dam & hEPP
- Contractor: Nurol-Cengiz JV
- Total Project Value: 780,000,000 EUR
- Location: Mardin / Turkey
- Scope: Construction of a concrete face rock fill dam with 24,000,000 m3 of dam body filling with a 1200 MW of electric generation capacity amassing to a total electric generation of 4,100,000,000 kWh/year.
Nurol Life
- Contractor: Nurol
- Total Project Value: 110,000,000 USD
- Location: Istanbul / Turkey
- Scope: Construction of a 50-floor high tower and a base structure with 4 floors including 440 residential units, 50 office units and social facilities.
Nurol Park
- Contractor: Nurol
- Total Project Value: 157,000,000 USD
- Location: Istanbul / Turkey
- Scope: Construction of 9 multi purpose buildings with a total enclosed area of 323,500 m2 including 1186 residential units, 118 office units and 87 units for the outdoors shopping area.
Tizi Ouzou-Bouira Motorway
- Contractor: Ozgun-Nurol-Engoa JV
- Estimated Project Value: 1,000,000,000 EUR
- Location: Tizi Ouzou / Algeria
- Scope: A total of 45 km 2x3 lane motorway including 21 viaducts and 2 dual tube tunnels.